HP 11622 HP Rack Options Installation Guide for the 11000 G2 Series Rack and t - Page 91

Securing the 1075 mm rack to the floor

Page 91 highlights

Securing the 1075 mm rack to the floor The following illustration indicates where to drill the holes to secure the 1075 mm rack to the floor. The distances are measured from the holes on the tie-downs. Have your building structural engineer drill the holes. After the holes are drilled, insert a bolt with a washer into each hole to secure the rack to the floor. Securing the 1200 mm rack to the floor The following illustration indicates where to drill the holes to secure the 1200 mm rack to the floor. The distances are measured from the holes on the tie-downs. Have your building structural engineer drill the holes. After your holes have been drilled, insert a bolt with a washer into each hole to secure the rack to the floor. Tie-Down kit 91

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97

Tie-Down kit 91
Securing the 1075 mm rack to the floor
The following illustration indicates where to drill the holes to secure the 1075 mm rack to the floor. The
distances are measured from the holes on the tie-downs. Have your building structural engineer drill the
holes. After the holes are drilled, insert a bolt with a washer into each hole to secure the rack to the floor.
Securing the 1200 mm rack to the floor
The following illustration indicates where to drill the holes to secure the 1200 mm rack to the floor. The
distances are measured from the holes on the tie-downs. Have your building structural engineer drill the
holes. After your holes have been drilled, insert a bolt with a washer into each hole to secure the rack to the
floor.