HP rp8420 Installation Guide, Fifth Edition - HP 9000 rp8420 Server - Page 49

PCI I/O Slot Details, Step 6.

Page 49 highlights

Installation Installing Accessories CAUTION Working out of sequence or not completing the actions within each step could cause the system to crash. Do not press the attention button until the latch is locked. Step 6. Press the attention button. The green power LED will start to blink. Figure 2-18 PCI I/O Slot Details Manual Release Latch Closed Manual Release Latch Open Attention Button Power LED (Green) Attention LED (Yellow) Step 7. Wait for the green power LED to stop blinking and remain solid green. Step 8. Check for errors in the hotplugd daemon log file (default: /var/adm/hotplugd.log). The critical resource analysis (CRA) performed while doing an attention button initiated add action is very restrictive and the action will not complete-it will fail-to protect critical resources from being impacted. For finer control over CRA actions use pdweb or the olrad command. Refer to the Interface Card OL* Support Guide located on the Web at http://docs.hp.com for details. Step 9. Replace the top cover. Step 10. Connect all cables to the installed PCI card. Chapter 2 49

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

Chapter 2
Installation
Installing Accessories
49
CAUTION
Working out of sequence or not completing the actions within each step could cause
the system to crash.
Do not press the attention button until the latch is locked.
Step 6.
Press the attention button.
The green power LED will start to blink.
Figure 2-18 PCI I/O Slot Details
Step 7.
Wait for the green power LED to stop blinking and remain solid green.
Step 8.
Check for errors in the hotplugd daemon log file (default: /var/adm/hotplugd.log).
The critical resource analysis (CRA) performed while doing an attention button initiated add action
is very restrictive and the action will not complete—it will fail—to protect critical resources from
being impacted. For finer control over CRA actions use
pdweb
or the
olrad
command. Refer to the
Interface Card OL* Support Guide located on the Web at http://docs.hp.com for details.
Step 9.
Replace the top cover.
Step 10.
Connect all cables to the installed PCI card.
Manual Release Latch Closed
Manual Release Latch Open
Attention Button
Power LED (Green)
Attention LED (Yellow)