IBM 306m User Guide - Page 42
Completing, installation, Installing, cover, Connecting, cables
UPC - 000435867605
View all IBM 306m manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 42 highlights
Completing the installation To complete the installation, complete the following steps: 1. Reinstall the cover. See "Installing the cover" for more information. 2. Install the server in the rack cabinet. See the Rack Installation Instructions that come with the server for detailed information about how to install the server in a rack cabinet. Attention: v Install the server only in a rack cabinet that has perforated doors. v Do not leave open space above or below an installed server in the rack cabinet. To help prevent damage to server components, always install a filler panel to cover the open space and to help ensure proper air circulation. See the documentation that comes with the rack cabinet for more information. 3. Connect the cables and power cords. For more information, see "Connecting the cables." 4. Update the server configuration. See "Updating the server configuration" on page 31 for more information. Installing the cover To install the cover, place it into position and slide it forward. Connecting the cables The following illustrations show the locations of the input and output connectors on the front and rear of the server. 30 IBM xSeries 306m Types 8849 and 8491: User's Guide