Sub-Zero 427R Wine Storage Installation Instructions - Page 42

Model WS-30 Installation, Complete the Installation, Panel Installation

Page 42 highlights

Model WS-30 Installation 42 Panel Installation If your customer has ordered either a framed or overlay model, you will be installing a door panel to give the unit the custom Sub-Zero look. Before you begin installing the panel, refer to the panel specifications for framed, overlay or flush inset applications on pages 44-52, and make sure you are working with the panel design called for in your installation. IMPORTANT NOTE: For overlay models, there are two design applications, overlay and flush inset. Be sure to use the correct panel sizes for your application. If your customer has chosen the stainless steel design, the unit has been shipped complete with a finished stainless steel look. It will not be necessary to install a door panel or handle hardware. In your final preparation for stainless steel units, use a stainless steel cleaner to remove any marks. Abrasive cleaners should not be used, as they may scratch the surface. IMPORTANT NOTE: Side panels, if used, will need to be installed before the unit is placed in its final position. Refer to page 53. Complete the Installation ANCHORING After door and side panels have been installed, the unit has been leveled and door adjustment completed, anchor the wine storage unit to the opening. This will assure a proper fit and a secure installation. IMPORTANT NOTE: Be sure to level and square the unit before anchoring it. To anchor the top of the unit to cabinetry, open the grille, and install the screws provided through the grille frame into the cabinetry. There are several hole locations provided. Check for proper door clearance by fully opening the door. Refer to the illustration below. To anchor the bottom of the unit, drive a screw through the side hole inside the roller base assembly. There is one on each side. The screw will need to go in at an angle in order to attach properly. Refer to the illustration below. Additional material may be needed behind the cleat to ensure sufficient anchoring. If the screws provided are not suitable for your application, you must provide adequate screws. ANCHORING SCREWS Top anchoring. ANCHORING SCREW Bottom anchoring.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

Model WS-30 Installation
42
ANCHORING
SCREWS
Top anchoring.
Bottom anchoring.
ANCHORING
SCREW
Complete the Installation
ANCHORING
After door and side panels have been installed, the unit
has been leveled and door adjustment completed, anchor
the wine storage unit to the opening. This will assure a
proper fit and a secure installation.
IMPORTANT NOTE:
Be sure to level and square the unit
before anchoring it.
To anchor the top of the unit to cabinetry, open the grille,
and install the screws provided through the grille frame
into the cabinetry. There are several hole locations
provided. Check for proper door clearance by fully
opening the door. Refer to the illustration below.
To anchor the bottom of the unit, drive a screw through
the side hole inside the roller base assembly. There is one
on each side. The screw will need to go in at an angle in
order to attach properly. Refer to the illustration below.
Additional material may be needed behind the cleat to
ensure sufficient anchoring.
Panel Installation
If your customer has ordered either a framed or overlay
model, you will be installing a door panel to give the unit
the custom Sub-Zero look. Before you begin installing the
panel, refer to the panel specifications for framed, overlay
or flush inset applications on pages 44–52, and make sure
you are working with the panel design called for in your
installation.
IMPORTANT NOTE:
For overlay models, there are two
design applications, overlay and flush inset. Be sure to
use the correct panel sizes for your application.
If your customer has chosen the stainless steel design, the
unit has been shipped complete with a finished stainless
steel look. It will not be necessary to install a door panel or
handle hardware. In your final preparation for stainless
steel units, use a stainless steel cleaner to remove any
marks. Abrasive cleaners should not be used, as they may
scratch the surface.
IMPORTANT NOTE:
Side panels, if used, will need to be
installed before the unit is placed in its final position. Refer
to page 53.
If the screws provided are not suitable for your
application, you must provide adequate screws.