Sub-Zero 427R Wine Storage Installation Instructions - Page 54

Installation Checklist

Page 54 highlights

Installation Checklist 54 Installation Checklist To ensure a safe and proper installation, the following checklist should be completed by the installer to ensure that no part of the installation has been overlooked. Have all packing materials been removed? Turn the unit on. Is it operating properly? If not, is the unit plugged in? Is the control turned on? Has the anti-tip bracket been installed securely and properly engaging the unit? Is the unit leveled properly with all leveling legs making contact with the floor? Has the kickplate been installed? Has the drain pan been installed properly (model WS-30)? Are panels attached securely and properly aligned? Has the door been aligned for proper appearance and operation? Has the unit been properly anchored to the opening? Does the 90° door stop need to be installed? Does the customer understand the unit's operation? Does the customer have the warranty package? Have any installation or service problems been noted on the product registration card? Has the registration card been mailed in? Have stainless steel panels been inspected for any imperfections? This is to be done by the authorized Sub-Zero dealer or installer with the customer, upon completion of installation. Stainless steel panels are covered by a limited 60-day warranty for cosmetic defects.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

Installation Checklist
54
Installation Checklist
To ensure a safe and proper installation, the following
checklist should be completed by the installer to ensure
that no part of the installation has been overlooked.
Have all packing materials been removed?
Turn the unit on. Is it operating properly?
If not, is the unit plugged in? Is the control turned on?
Has the anti-tip bracket been installed securely and
properly engaging the unit?
Is the unit leveled properly with all leveling legs making
contact with the floor? Has the kickplate been
installed?
Has the drain pan been installed properly (model
WS-30)?
Are panels attached securely and properly aligned?
Has the door been aligned for proper appearance and
operation?
Has the unit been properly anchored to the opening?
Does the 90° door stop need to be installed?
Does the customer understand the unit's operation?
Does the customer have the warranty package?
Have any installation or service problems been noted
on the product registration card? Has the registration
card been mailed in?
Have stainless steel panels been inspected for any
imperfections? This is to be done by the authorized
Sub-Zero dealer or installer with the customer, upon
completion of installation. Stainless steel panels are
covered by a limited 60-day warranty for cosmetic
defects.