Toshiba Tecra C50-CMZC002 Mobile Zero Client User Operation Guide - Page 8

Turning off the power, 3. Start your work in VDI Environment

Page 8 highlights

3 If the downloading process fails, an error message will be displayed. 4  When this process is completed, the VDI screen is displayed. Refer to section '2.3. Start your work in VDI Environment' 2.2. Turning off the power (1). Before turning off power, please save the file(s) you have been working on (2). Press power button to turn off the TMZC Client PC 2.3. Start your work in VDI Environment (1). Choose your VDI Server Memo For VMware® please refer to their documents for detailed operations (eg. certain screens are skipped when there is a fixed server, etc.). (2). Input your Username, Password and Domain for the server. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

7
3
If the downloading process fails, an error message will be displayed.
4
When this process is completed, the VDI screen is displayed. Refer
to section
2.3. Start your work in VDI Environment
2.2. Turning off the power
(1). Before turning off power, please save the file(s) you have been working on
(2). Press power button to turn off the TMZC Client PC
2.3. Start your work in VDI Environment
(1). Choose your VDI Server
For VMware® please refer to their documents for detailed operations (eg. certain
screens are skipped when there is a fixed server, etc.).
(2). Input your Username, Password and Domain for the server.
Memo