Tripp Lite SV20KM1P1B Owners Manual for SmartOnline 208V SV-Series 3-Phase Mod - Page 10

Unpacking the UPS

Page 10 highlights

4. Positioning and Pre-Installation 4.5 Unpacking the UPS 1. Once the UPS system has arrived at the installation site, it may be removed from the packing box. Follow the unpacking procedure below to remove main carton (Figure 4.1) and protective materials (Figure 4.2). Figure 4.1 Figure 4.2 2. Place the ramp delivered in the packing box in front of the UPS cabinet and align the hole in the ramp to the metal stud on the pallet and lock into place (Figure 4.3). 3. Remove the four fixing plates (Figure 4.4) and loosen the leveling feet by rotating them counterclockwise, raising them above the level of the casters. The UPS cabinet may now be rolled off the pallet and down the ramp. At least three people should be present to move the UPS to the installation area, two to support either side of the UPS and a third to guide the UPS into its final location. 4. The casters are designed to move on a level surface over a short distance for final UPS placement. Do not move the UPS using the casters over long distances or across uneven surfaces. This could damage the casters and/or tip the UPS. 5. Once the UPS is in final position, rotate the leveling feet clockwise below the level of the casters to secure in place (Figure 4.5). Do not rest the UPS permanently on the casters. Figure 4.3 Figure 4.4 Figure 4.5 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112

10
4. Positioning and Pre-Installation
4.5 Unpacking the UPS
1. Once the UPS system has arrived at the installation site, it may be removed from the packing box. Follow the unpacking procedure below to
remove main carton (Figure 4.1) and protective materials (Figure 4.2).
Figure 4.1
Figure 4.2
2. Place the ramp delivered in the packing box in front of the UPS cabinet and align the hole in the ramp to the metal stud on the pallet and lock
into place (Figure 4.3).
3. Remove the four fixing plates (Figure 4.4) and loosen the leveling feet by rotating them counterclockwise, raising them above the level of the
casters. The UPS cabinet may now be rolled off the pallet and down the ramp. At least three people should be present to move the UPS to
the installation area, two to support either side of the UPS and a third to guide the UPS into its final location.
4. The casters are designed to move on a level surface over a short distance for final UPS placement. Do not move the UPS using the casters
over long distances or across uneven surfaces. This could damage the casters and/or tip the UPS.
5. Once the UPS is in final position, rotate the leveling feet clockwise below the level of the casters to secure in place (Figure 4.5). Do not rest
the UPS permanently on the casters.
Figure 4.3
Figure 4.4
Figure 4.5