Tripp Lite SV20KM1P1B Owners Manual for SmartOnline 208V SV-Series 3-Phase Mod - Page 18
Conduit Box Installation for Small Frame Models
![]() |
View all Tripp Lite SV20KM1P1B manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
7. Installation 7.4 Conduit Box Installation (for Small Frame Models) 1. Remove the terminal block cover located on the top-front of the UPS to access the UPS system's input, output and grounding connection terminals. 2. The terminal block cover will be replaced with the terminal conduit box found inside the UPS (see illustration). 3. Prepare the terminal box cover with circular cutouts to allow wiring conduits to pass through. 4. Attach the terminal box cover to the top of the UPS system after flexible conduit has been attached. Notes: • Make sure the wires are tightly connected to the terminals. • Cabling should be protected by flexible conduit and routed through the appropriate knockouts in the terminal block cover. • Conduit box part number: 103509A Example of conduit box with circular cutouts installed Example of conduit box located inside UPS frame 18
![](/manual_guide/products/tripp-lite-sv80kl-owners-manual-smartonline-208v-svseries-3phase-modular-ups-systems-multilanguage-ec4c26a/18.png)