Brother International KE-436C Instruction Manual - English - Page 16

X, Y, Sewing sensor, Pulse motor

Page 16 highlights

3. INSTALLATION 1. Gently tilt back the machine head. Note: After tilting back the machine head, do not push the face side or the pulley side from above. 2. Pass the cord bundle (1) from the machine head through the hole (2) in the work table. 3. Gently return the machine head to its original position. 4. Remove the six screws (3), and then open the control box cover (main P.C. board mounting plate (4)). Note: When opening the cover, hold it securely so that it does not fall down. 5. Loosen the two screws (5), and then open the cord presser plate (6) in the direction of the white arrow and pass the cord bundle (1) through the opening. 6. Remove the screw (7), and then pass it through the terminal holes in the ground cord (8) from the machine head. Then re-tighten the screw (7) so that the ground cord (8) is secured as shown in the illustration. 7. Remove the screw (9), and then pass it through the terminal hole in the ground cord (10) from the upper shaft motor and the ground cord (11) from the operation panel. Then re-tighten the screw (9) so that the ground cords (10) and (11) are secured as shown in the illustration. Note: Make sure that the ground connections are secure in order to ensure safety. 8. Securely connect connectors P1 to P7, P11, P14, P18 and P20 as indicated in the table below. Note: Check that the connector is facing the correct way, and then insert it firmly until it locks into place. Furthermore, lock the cord clamp at the top. Machine head connectors Connection location No. of pins Head position switch 9-pin X, Y, Sewing sensor 12-pin Synchronizer Machine specification select connector Thread wiper solenoid Thread take-up solenoid Presser solenoid Thread trimmer solenoid Pulse motor, Y 5-pin 8-pin 5-pin 4-pin 4-pin (blue) Pulse motor, X 4-pin Operation panel 10-pin Upper shaft motor 3-pin EMERGENCY STOP switch 6-pin Solenoid valve 12-pin Cord mark [1A] [1] [2] [3] [4] [5] [6] [7] [M] None [18] None Connection location on circuit board P1-A (ORG1) P1-B (ORG2) P2 (SYNCHRO) P3 (SELECT) P4 (SOL2) P5 (SOL) P6 (YPM) P7 (XPM) P20 (RSPORT) P11 (UVW) P18 (HEAD) P14 (AIR) Cord clamps used None None (G) None (G)(H) (G)(H) (G)(H) (G)(H) (A)(B) (A)(B)(C)(D)(E)(F) None (A)(B)(C)(D) 9. Secure the cord bundle (1) with the cord clamps (12) and (13). 10. Close the cord presser plate (6) in the direction of the black arrow, and secure it by tightening the screws (5). Note: Check that the cords do not get pulled when the machine head is tilted back gently. 11. Tighten the cover (main P.C. board mounting plate (4)) with the six screws (3). Note: Check that the cords do not come into contact with the fan (14) and that they are not clamped by the cover at this time. KE-436C 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73

3. INSTALLATION
10
KE-436C
1.
Gently tilt back the machine head.
Note:
After tilting back the machine head, do not push the face side or the pulley side from above.
2.
Pass the cord bundle (1) from the machine head through the hole (2) in the work table.
3.
Gently return the machine head to its original position.
4.
Remove the six screws (3), and then open the control box cover (main P.C. board mounting plate (4)).
Note:
When opening the cover, hold it securely so that it does not fall down.
5.
Loosen the two screws (5), and then open the cord presser plate (6) in the direction of the white arrow and pass the cord
bundle (1) through the opening.
6.
Remove the screw (7), and then pass it through the terminal holes in the ground cord (8) from the machine head. Then
re-tighten the screw (7) so that the ground cord (8) is secured as shown in the illustration.
7.
Remove the screw (9), and then pass it through the terminal hole in the ground cord (10) from the upper shaft motor and
the ground cord (11) from the operation panel. Then re-tighten the screw (9) so that the ground cords (10) and (11) are
secured as shown in the illustration.
Note:
Make sure that the ground connections are secure in order to ensure safety.
8.
Securely connect connectors P1 to P7, P11, P14, P18 and P20 as indicated in the table below.
Note:
Check that the connector is facing the correct way, and then insert it firmly until it locks into place.
Furthermore, lock the cord clamp at the top.
Machine head connectors
Connection location
No. of pins
Cord mark
Connection location
on circuit board
Cord clamps used
Head position switch
9-pin
[1A]
P1-A (ORG1)
None
X, Y, Sewing sensor
12-pin
[1]
P1-B (ORG2)
None
Synchronizer
5-pin
[2]
P2 (SYNCHRO)
(G)
Machine specification
select connector
8-pin
[3]
P3 (SELECT)
None
Thread wiper solenoid
Thread take-up solenoid
5-pin
[4]
P4 (SOL2)
(G)(H)
Presser solenoid
Thread trimmer solenoid
4-pin
[5]
P5 (SOL)
(G)(H)
Pulse motor, Y
4-pin (blue)
[6]
P6 (YPM)
(G)(H)
Pulse motor, X
4-pin
[7]
P7 (XPM)
(G)(H)
Operation panel
10-pin
[M]
P20 (RSPORT)
(A)(B)
Upper shaft motor
3-pin
None
P11 (UVW)
(A)(B)(C)(D)(E)(F)
EMERGENCY STOP switch
6-pin
[18]
P18 (HEAD)
None
Solenoid valve
12-pin
None
P14 (AIR)
(A)(B)(C)(D)
9.
Secure the cord bundle (1) with the cord clamps (12) and (13).
10. Close the cord presser plate (6) in the direction of the black arrow, and secure it by tightening the screws (5).
Note:
Check that the cords do not get pulled when the machine head is tilted back gently.
11. Tighten the cover (main P.C. board mounting plate (4)) with the six screws (3).
Note:
Check that the cords do not come into contact with the fan (14) and that they are not clamped by the cover at this time.