IBM 887022X Installation Guide - Page 37

information.

Page 37 highlights

d. Rotate the SMP Expansion Module locking levers forward until the SMP Expansion Module is securely fastened in place. See the following illustration. Center plane Locking levers Cover Handle Figure 22. Locking lever position when the SMP Expansion Module is installed e. Install the retention bracket. Notes: 1. If there are two SMP Expansion Modules installed in your server, you must install the retention bracket for each of the SMP Expansion Modules. Be sure to install the bottom retention bracket first, then repeat steps 2a through 2e for the top SMP Expansion Module. 2. If you are going to ship or move the server over a long distance, you must reinstall the shipping thumbscrews. f. Install the EMC shield. (See step 4c on page 12 if you need more detailed information.) Chapter 2. Installing options 25

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124

d.
Rotate
the
SMP
Expansion
Module
locking
levers
forward
until
the
SMP
Expansion
Module
is
securely
fastened
in
place.
See
the
following
illustration.
e.
Install
the
retention
bracket.
Notes:
1.
If
there
are
two
SMP
Expansion
Modules
installed
in
your
server,
you
must
install
the
retention
bracket
for
each
of
the
SMP
Expansion
Modules.
Be
sure
to
install
the
bottom
retention
bracket
first,
then
repeat
steps
2a
through
2e
for
the
top
SMP
Expansion
Module.
2.
If
you
are
going
to
ship
or
move
the
server
over
a
long
distance,
you
must
reinstall
the
shipping
thumbscrews.
f.
Install
the
EMC
shield.
(See
step
4c
on
page
12
if
you
need
more
detailed
information.)
Locking
levers
Cover
Handle
Center plane
Figure
22.
Locking
lever
position
when
the
SMP
Expansion
Module
is
installed
Chapter
2.
Installing
options
25