IBM 887022X Installation Guide - Page 51

cable-management

Page 51 highlights

Cable-management arm Long SMP expansion cables Figure 38. Routing cables through the cable management arm c. Connect one end of a 2.5 m (8.2 ft) SMP Expansion cable to port 1 of SMP Expansion Module 1 on the primary server; then, route the cable through the cable-management arm as in step 3a on page 38. d. Connect one end of a 2.5 m (8.2 ft) SMP Expansion cable to port 2 of SMP Expansion Module 1 on the primary server; then, route the cable through the cable-management arm as in step 3b on page 38. e. Verify that a 25.4 cm (10 in.) SMP Expansion cable is connected between port 3 of SMP Expansion Module 0 and port 3 of SMP Expansion Module 1. 4. Connect the SMP Expansion cables to the secondary server: a. Locate the SMP Expansion cable that is connected to port 1 of SMP Expansion Module 0 on the primary server; then, connect the opposite end of the cable to port 1 of SMP Expansion Module 2. Next, route the cable through the secondary cable-management arm. b. Locate the SMP Expansion cable that is connected to port 2 of SMP Expansion Module 1 on the primary server; then, connect the opposite end of the cable to port 2 of SMP Expansion Module 2. Next, route the cable through the secondary cable-management arm. c. Locate the SMP Expansion cable that is connected to port 1 of SMP Expansion Module 1 on the primary server; then, connect the opposite end of the cable to port 1 of SMP Expansion Module 3. Next, route the cable through the secondary cable-management arm. d. Locate the SMP Expansion cable that is connected to port 2 of SMP Expansion Module 0 on the primary server; then, connect the opposite end of the cable to port 2 of SMP Expansion Module 3. Next, route the cable through the secondary cable-management arm. e. Verify that a 25.4 cm (10 inches) SMP Expansion cable is connected between port 3 of SMP Expansion Module 2 and port 3 of SMP Expansion Module 3. Chapter 2. Installing options 39

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124

c.
Connect
one
end
of
a
2.5
m
(8.2
ft)
SMP
Expansion
cable
to
port
1
of
SMP
Expansion
Module
1
on
the
primary
server;
then,
route
the
cable
through
the
cable-management
arm
as
in
step
3a
on
page
38.
d.
Connect
one
end
of
a
2.5
m
(8.2
ft)
SMP
Expansion
cable
to
port
2
of
SMP
Expansion
Module
1
on
the
primary
server;
then,
route
the
cable
through
the
cable-management
arm
as
in
step
3b
on
page
38.
e.
Verify
that
a
25.4
cm
(10
in.)
SMP
Expansion
cable
is
connected
between
port
3
of
SMP
Expansion
Module
0
and
port
3
of
SMP
Expansion
Module
1.
4.
Connect
the
SMP
Expansion
cables
to
the
secondary
server:
a.
Locate
the
SMP
Expansion
cable
that
is
connected
to
port
1
of
SMP
Expansion
Module
0
on
the
primary
server;
then,
connect
the
opposite
end
of
the
cable
to
port
1
of
SMP
Expansion
Module
2.
Next,
route
the
cable
through
the
secondary
cable-management
arm.
b.
Locate
the
SMP
Expansion
cable
that
is
connected
to
port
2
of
SMP
Expansion
Module
1
on
the
primary
server;
then,
connect
the
opposite
end
of
the
cable
to
port
2
of
SMP
Expansion
Module
2.
Next,
route
the
cable
through
the
secondary
cable-management
arm.
c.
Locate
the
SMP
Expansion
cable
that
is
connected
to
port
1
of
SMP
Expansion
Module
1
on
the
primary
server;
then,
connect
the
opposite
end
of
the
cable
to
port
1
of
SMP
Expansion
Module
3.
Next,
route
the
cable
through
the
secondary
cable-management
arm.
d.
Locate
the
SMP
Expansion
cable
that
is
connected
to
port
2
of
SMP
Expansion
Module
0
on
the
primary
server;
then,
connect
the
opposite
end
of
the
cable
to
port
2
of
SMP
Expansion
Module
3.
Next,
route
the
cable
through
the
secondary
cable-management
arm.
e.
Verify
that
a
25.4
cm
(10
inches)
SMP
Expansion
cable
is
connected
between
port
3
of
SMP
Expansion
Module
2
and
port
3
of
SMP
Expansion
Module
3.
Cable-management arm
Long SMP expansion cables
Figure
38.
Routing
cables
through
the
cable
management
arm
Chapter
2.
Installing
options
39