Intel S2600CP S2600CP/P4000CP family Service Guide - Page 57
Replacing the Power Distribution Board
View all Intel S2600CP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 57 highlights
Hardware Installations and Upgrades Figure 68. Removing Hot-swap Power Supply Module from Chassis 4. Insert new power supply module into the power supply cage and push all the way until it clicks into place. Figure 69. Installing Hot-swap Power Supply Module into Chassis Replacing the Power Distribution Board WARNING Hazardous voltage, current, and energy levels are present inside the power supply. There are no user-serviceable parts inside it; servicing should be done by technically qualified personnel. 1. Observe the safety and ESD precautions at the beginning of this book. 2. Power down the server and unplug all peripheral devices and the AC power cable. 3. Remove the chassis cover. For instructions, see "Removing the Chassis Cover". 4. Remove the air duct. For instructions, see "Installing the Airduct". 5. Disconnect all internal power cables from chassis components and server board. 6. If present, press on green latch in the direction shown while pulling on handle to remove power supply from chassis. Repeat this step for the second hot-swap power supply if it is installed. Intel® Server Board S2600CP Intel® Server System P4000CP Family Service Guide (Preliminary) 43