Intel S2600CP S2600CP/P4000CP family Service Guide - Page 69

Removing and Installing 8x2.5 Hot-swap Hard Drive, Cage Assembly

Page 69 highlights

Hardware Installations and Upgrades Figure 89. 8x3.5" Hot Swap Backplane Cable Connections 8. Install the front bezel. For instructions, see "Installing the Front Bezel (Pedestal Only)". 9. Install the air duct if the air duct is removed. For instructions, see "Installing the Airduct". 10. Install the chassis cover. For instructions, see "Installing the Chassis Cover". 11. Plug all peripheral devices and the AC power cable into the server. 12. Power up the server. Removing and Installing 8x2.5" Hot-swap Hard Drive Cage Assembly Removing 8x2.5" Hot-swap Hard Drive Cage Assembly 1. Observe the safety and ESD precautions at the beginning of this book. 2. Power down the server and unplug all peripheral devices and the AC power cable. 3. Remove the chassis cover. For instructions, see "Removing the Chassis Cover". 4. Remove the front bezel if it is installed. For instructions, see "Removing the Front Bezel (Pedesal Only)". 5. Disconnect the power and data cables to the backplane. 6. Use screwdriver to release the hot-swap hard drive cage (see letter "A") from the chassis and remove the hot-swap hard drive cage (see letter "B"). Intel® Server Board S2600CP Intel® Server System P4000CP Family Service Guide (Preliminary) 55

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187

Hardware Installations and Upgrades
Intel
®
Server Board S2600CP Intel
®
Server System P4000CP Family Service Guide (Preliminary)
55
Figure 89. 8x3.5” Hot Swap Backplane Cable Connections
8.
Install the front bezel. For instructions, see “Installing the Front Bezel (Pedestal Only)”.
9.
Install the air duct if the air duct is removed. For instructions, see “Installing the Airduct”.
10.
Install the chassis cover. For instructions, see “Installing the Chassis Cover”.
11.
Plug all peripheral devices and the AC power cable into the server.
12.
Power up the server.
Removing and Installing 8x2.5” Hot-swap Hard Drive
Cage Assembly
Removing 8x2.5” Hot-swap Hard Drive Cage Assembly
1.
Observe the safety and ESD precautions at the beginning of this book.
2.
Power down the server and unplug all peripheral devices and the AC power cable.
3.
Remove the chassis cover. For instructions, see “Removing the Chassis Cover”.
4.
Remove the front bezel if it is installed. For instructions, see “Removing the Front Bezel
(Pedesal Only)”.
5.
Disconnect the power and data cables to the backplane.
6.
Use screwdriver to release the hot-swap hard drive cage (see letter
A”) from the chassis
and remove the hot-swap hard drive cage (see letter
B”).