HP Scanjet 5000 User Guide - Page 73

Eight-bay SFF front drive cage option for bay 1

Page 73 highlights

16. Slide the retention clips to the locked position. 17. Install the access panel (see Installing the access panel on page 18). 18. Slide the server into the rack. 19. Connect each power cord to the server. 20. Connect each power cord to the power source. 21. Power up the server (see Powering up the server on page 16). Eight-bay SFF front drive cage option for bay 1 To install the component: 1. Power down the server (see Powering down the server on page 16). 2. Remove all power: a. Disconnect each power cord from the power source. b. Disconnect each power cord from the server. 3. Do one of the following: a. Extend the server from the rack (see Extending the server from the rack on page 17). b. Remove the server from the rack (see Removing the server from the rack on page 17). 4. Remove the access panel (see Removing the access panel on page 18). Eight-bay SFF front drive cage option for bay 1 65

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133

16.
Slide the retention clips to the locked position.
17.
Install the access panel (see
Installing the access panel
on page
18
).
18.
Slide the server into the rack.
19.
Connect each power cord to the server.
20.
Connect each power cord to the power source.
21.
Power up the server (see
Powering up the server
on page
16
).
Eight-bay SFF front drive cage option for bay 1
To install the component:
1.
Power down the server (see
Powering down the server
on page
16
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
a.
Extend the server from the rack (see
Extending the server from the rack
on page
17
).
b.
Remove the server from the rack (see
Removing the server from the rack
on page
17
).
4.
Remove the access panel (see
Removing the access panel
on page
18
).
Eight-bay SFF front drive cage option for bay 1
65