HP bc1000 Setup & Installation Guide - Page 137

Run the Computer Setup F10 Utility to recon the Blade, Power up the Blade PC. See

Page 137 highlights

Blade PC Battery 6. Install the Blade PC in the enclosure. See the "Installing a Blade PC" section in Chapter 4, "Installing and Cabling the HP CCI Solution." 7. Power up the Blade PC. See the "Powering Up the HP CCI Solution" section in Chapter 4, "Installing and Cabling the HP CCI Solution." 8. Run the Computer Setup (F10) Utility to reconfigure the Blade PC with the new battery. See the "Computer Setup (F10) Utility" section in Chapter 5, "Deployment and Management." Setup and Installation Guide www.hp.com G-3

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146

Setup and Installation Guide
www.hp.com
G-3
Blade PC Battery
6. Install the Blade PC in the enclosure. See the
“Installing a Blade
PC”
section in
Chapter 4, “Installing and Cabling the HP CCI
Solution.”
7. Power up the Blade PC. See the
“Powering Up the HP CCI
Solution”
section in
Chapter 4, “Installing and Cabling the HP
CCI Solution.”
8. Run the Computer Setup (F10) Utility to reconfigure the Blade
PC with the new battery. See the
“Computer Setup (F10) Utility”
section in
Chapter 5, “Deployment and Management.”