TP-Link 13dBi PharosControl V1 UserGuide - Page 37

Upgrade Tab, Reboot Status

Page 37 highlights

Pharos Control User Guide The right window of Section C displays the progress bar of the selected reboot operation and its result. Entry introduction: Figure 3-11 Reboot Status Reboot: Status: Device Name: Progress: The time when the reboot operation begins. The status of the reboot operation. The name of the device. The progress of the reboot operation. Upgrade Tab: The left window of Section C displays the upgrade operation list. Entry introduction: Queue Total: Figure 3-12 Upgrade List The total number of the upgrade operations in the list below. 34

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77

Pharos Control User Guide
34
The right window of Section C displays the progress bar of the selected reboot operation and its
result.
Figure 3-11 Reboot Status
Entry introduction:
Reboot:
The time when the reboot operation begins.
Status:
The status of the reboot operation.
Device Name:
The name of the device.
Progress:
The progress of the reboot operation.
Upgrade Tab
:
The left window of Section C displays the upgrade operation list.
Figure 3-12 Upgrade List
Entry introduction:
Queue Total:
The total number of the upgrade operations in the list below.