Weider Pro 8500 Smith Cage Bench English Manual - Page 20

Attach the 90mm Pulley to the Long Double

Page 20 highlights

31. Wrap the Low Cable (72) over a 90mm Pulley (58). Attach the 90mm Pulley to the Top Frame 31 (16) with an M10 x 43mm Bolt (96) and an M10 Locknut (79). 79 58 96 16 72 32. Route the Low Cable (72) under a 90mm Pulley (58). Attach the 90mm Pulley to the Long Double 32 U-bracket (47) with an M10 x 43mm Bolt (96) and an M10 Locknut (79). 33. Wrap the Low Cable (72) over a 90mm Pulley (58). Attach the 90mm Pulley to the Top Frame 33 (16) with an M10 x 43mm Bolt (96) and an M10 Locknut (79). 72 58 79 96 47 96 16 79 72 58 20

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44

20
31. Wrap the Low Cable (72) over a 90mm Pulley
(58). Attach the 90mm Pulley to the Top Frame
(16) with an M10 x 43mm Bolt (96) and an M10
Locknut (79).
33. Wrap the Low Cable (72) over a 90mm Pulley
(58). Attach the 90mm Pulley to the Top Frame
(16) with an M10 x 43mm Bolt (96) and an M10
Locknut (79).
79
79
96
96
16
16
58
58
31
33
72
72
32. Route the Low Cable (72) under a 90mm Pulley
(58). Attach the 90mm Pulley to the Long Double
U-bracket (47) with an M10 x 43mm Bolt (96)
and an M10 Locknut (79).
32
72
79
96
58
47