Weider Pro 8500 Smith Cage Bench English Manual - Page 20
Attach the 90mm Pulley to the Long Double
View all Weider Pro 8500 Smith Cage Bench manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
31. Wrap the Low Cable (72) over a 90mm Pulley (58). Attach the 90mm Pulley to the Top Frame 31 (16) with an M10 x 43mm Bolt (96) and an M10 Locknut (79). 79 58 96 16 72 32. Route the Low Cable (72) under a 90mm Pulley (58). Attach the 90mm Pulley to the Long Double 32 U-bracket (47) with an M10 x 43mm Bolt (96) and an M10 Locknut (79). 33. Wrap the Low Cable (72) over a 90mm Pulley (58). Attach the 90mm Pulley to the Top Frame 33 (16) with an M10 x 43mm Bolt (96) and an M10 Locknut (79). 72 58 79 96 47 96 16 79 72 58 20
20
31. Wrap the Low Cable (72) over a 90mm Pulley
(58). Attach the 90mm Pulley to the Top Frame
(16) with an M10 x 43mm Bolt (96) and an M10
Locknut (79).
33. Wrap the Low Cable (72) over a 90mm Pulley
(58). Attach the 90mm Pulley to the Top Frame
(16) with an M10 x 43mm Bolt (96) and an M10
Locknut (79).
79
79
96
96
16
16
58
58
31
33
72
72
32. Route the Low Cable (72) under a 90mm Pulley
(58). Attach the 90mm Pulley to the Long Double
U-bracket (47) with an M10 x 43mm Bolt (96)
and an M10 Locknut (79).
32
72
79
96
58
47