Compaq ProLiant CL380 Compaq ProLiant CL380 User Guide - Page 182
Completing the Installation Process, Check the server node Power On/Standby switch LED indicators.
View all Compaq ProLiant CL380 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 182 highlights
Cabling Guidelines 5-21 4. Press the Power On/Standby switch on server node 1. 5. Check the server node Power On/Standby switch LED indicators. The following settings indicate that the power switch is on and there is a link to the network: The Power On/Standby LED turns from amber to green The Link LED turns green 6. When the Power On/Standby LED turns solid green, watch for the hard drive LED indicators to blink. If the LED indicators do not light, power down the node and check the power cable connection to the hard drive cage. 7. Repeat steps 4 through 6 for server node 2. Completing the Installation Process Use the Compaq SmartStart and Support Software CD to configure the system. For detailed instructions, refer to the Compaq ProLiant CL380 Software User Guide. IMPORTANT: The SmartStart and Support Software CD also holds the Compaq System Configuration Utility. Run the System Configuration Utility after you install an option in your ProLiant CL380.