HP rp5400 Installation Guide, Third Edition - HP rp5400 Family of Servers - Page 50

Step 1., A5575A Rail Kit

Page 50 highlights

Server Unpacking and Installation Stationary L-Bracket Rail Assembly • Ensure that the rails extend out from the cabinet posts sufficiently to properly and safely support the equipment being installed. To install an rp54xx Server on stationary rails in an approved cabinet proceed as follows: Step 1. Locate the rail mounting height in the cabinet. Allow for the following space requirements: • For each rp54xx Server, allow 31.8cm (12.5 inches) vertically (7 EIAs or Rack Units (RUs). • If installing the A5575A rail kit, allow an additional vertical 4.45cm (1.75 inches (1 EIA) each set of rails. 31.8 cm (12.5 inches 4.45 cm (1.75 Inches rp54xx Server Rail rp54xx Server Rail 31.8 cm (14.25 inches A5575A Rail Kit in approved Non- E-Series cabinet shown Step 2. Install sheet metal nut(s) in the vertical cabinet posts at the required height for the kit being installed: • Install the first nut either: - 4.45 cm (1.75 Inches) above the top, or - 31.8 cm (12.5 inches) below the bottom of the last server. • If installing a A5562A rail kit, install the second nut in the next frame hole below the first. Step 3. Hold the rail in place and insert and tighten the screws. For installation of other qualified cabinet and rail combinations refer to the safety precautions and instructions accompanying them. 50 Chapter 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84

Server Unpacking and Installation
Stationary L-Bracket Rail Assembly
Chapter 2
50
Ensure that the rails extend out from the cabinet posts sufficiently to properly and safely support the
equipment being installed.
To install an rp54xx Server on stationary rails in an approved cabinet proceed as follows:
Step 1.
Locate the rail mounting height in the cabinet. Allow for the following space requirements:
For each rp54xx Server, allow 31.8cm (12.5 inches) vertically (7 EIAs or Rack Units (RUs).
If installing the A5575A rail kit, allow an
additional
vertical 4.45cm (1.75 inches (1 EIA) each
set of rails.
Step 2.
Install sheet metal nut(s) in the vertical cabinet posts at the required height for the kit being
installed:
Install the first nut either:
4.45 cm (1.75 Inches) above the top, or
31.8 cm (12.5 inches) below the bottom of the last server.
If installing a A5562A rail kit, install the second nut in the next frame hole below the first.
Step 3.
Hold the rail in place and insert and tighten the screws.
For installation of other qualified cabinet and rail combinations refer to the safety precautions and
instructions accompanying them.
rp54xx
Server
31.8 cm
(12.5
inches
Rail
31.8 cm
(14.25
inches
rp54xx
Server
Rail
4.45 cm
(1.75
Inches
A5575A Rail Kit
in approved
Non- E-Series
cabinet shown