Xerox 6180N Generic MICR Fundamentals Guide  - Page 20

The checks are printed.

Page 20 highlights

Overview 1-10 Figure 1-3. Check ordering and production cycle 1. Design requirements are defined for a new account. 2. Requirements are passed to application development. 3. Samples pass internal quality checks. 4. Samples are forwarded to the bank for approval. 5. Any problems are referred to application developers, who ensure that the problems cannot occur in production. 6. After approval by the bank, the check design becomes available for routine production. 7. Variable check data is prepared for incorporation. 8. The checks are printed. 9. The printed checks are inspected. 10. Any problems are reported to the source for correction and reprinting. 11. When they have passed bank validation and quality inspection by the issuer, the checks are issued to the payee. Generic MICR Fundamentals Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172

Overview
1-10
Generic MICR Fundamentals Guide
Figure 1-3. Check ordering and production cycle
1.
Design requirements are defined for a new account.
2.
Requirements are passed to application development.
3.
Samples pass internal quality checks.
4.
Samples are forwarded to the bank for approval.
5.
Any problems are referred to application developers, who
ensure that the problems cannot occur in production.
6.
After approval by the bank, the check design becomes
available for routine production.
7.
Variable check data is prepared for incorporation.
8.
The checks are printed.
9.
The printed checks are inspected.
10.Any problems are reported to the source for correction and
reprinting.
11.When they have passed bank validation and quality
inspection by the issuer, the checks are issued to the payee.