Cisco 2970 Hardware Installation Guide - Page 160

SunNet Manager, See TN power warning

Page 160 highlights

Index R rack installation bracket mounting points 2-10 rear panel AC power connector 1-21 console port B-5 RPS connector 1-21 regulatory statements, EMC 2-4 to 2-6 RJ-21 connector illustration 1-7 pinouts B-5 RJ-45 connector, console port 2-43, B-3, B-5 RJ-45 console port 1-19 rollover cable 2-43, B-6 identifying B-6 pinouts B-8 RPS 300 connector 1-23 supported switches 1-22 warning C-2 RPS 600 connector 1-22 LED 1-13 supported switches 1-22 warning C-1 RPS LED 1-13 to 1-14 S safety C-1 SC connectors B-2 SPEED LED 1-15 stacking the chassis warning C-7 STAT LED 1-14 to 1-17 straight-through cable pinouts cables straight-through B-4 SunNet Manager 1-4 supply circuit warning C-15 switch powering on 2-24 switched ports, module 1-8 System LED 1-12 T telco racks 2-15 telephone network power warning See TN power warning C-10 temperature maximum for installation 2-7, A-2 warning C-9 temperature warning C-9 terminal, connecting to switch 2-42 terminal adapter pinouts RH-45-to-RJ-45 B-7 IN-6 Catalyst 2900 Series XL Hardware Installation Guide 78-6461-04

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162

Index
IN-6
Catalyst 2900 Series XL Hardware Installation Guide
78-6461-04
R
rack installation
bracket mounting points
2-10
rear panel
AC power connector
1-21
console port
B-5
RPS connector
1-21
regulatory statements, EMC
2-4 to 2-6
RJ-21 connector
illustration
1-7
pinouts
B-5
RJ-45 connector, console port
2-43, B-3, B-5
RJ-45 console port
1-19
rollover cable
2-43, B-6
identifying
B-6
pinouts
B-8
RPS 300
connector
1-23
supported switches
1-22
warning
C-2
RPS 600
connector
1-22
LED
1-13
supported switches
1-22
warning
C-1
RPS LED
1-13 to 1-14
S
safety
C-1
SC connectors
B-2
SPEED LED
1-15
stacking the chassis warning
C-7
STAT LED
1-14 to 1-17
straight-through cable pinouts
cables
straight-through
B-4
SunNet Manager
1-4
supply circuit warning
C-15
switch
powering on
2-24
switched ports, module
1-8
System LED
1-12
T
telco racks
2-15
telephone network power warning
See TN power warning
C-10
temperature
maximum for installation
2-7, A-2
warning
C-9
temperature warning
C-9
terminal, connecting to switch
2-42
terminal adapter pinouts
RH-45-to-RJ-45
B-7