Rack Installation
![]() |
UPC - 790069250682
View all D-Link 3250TG manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
D-Link DES-3250TG Standalone Layer 2 Switch Figure 2-1. Installing rubber feet for desktop installation Rack Installation The DES-3250TG can be mounted in an EIA standard-sized, 19-inch rack, which can be placed in a wiring closet with other equipment. To install, attach the mounting brackets on the switch's side panels (one on each side) and secure them with the screws provided. Figure 2- 2. Attaching the mounting brackets to the switch Then, use the screws provided with the equipment rack to mount the switch on the rack. Figure 2-3. Installing the switch on an equipment rack 5
![](/manual_guide/products/dlink-des3250tg-product-manual-6f58f05/13.png)
D-Link DES-3250TG Standalone Layer 2 Switch
Figure 2-1.
Installing rubber feet for desktop installation
Rack Installation
The DES-3250TG can be mounted in an EIA standard-sized, 19-inch rack, which can be placed in a
wiring closet with other equipment. To install, attach the mounting brackets on the switch’s side panels
(one on each side) and secure them with the screws provided.
Figure 2- 2.
Attaching the mounting brackets to the switch
Then, use the screws provided with the equipment rack to mount the switch on the rack.
Figure 2-3.
Installing the switch on an equipment rack