HP D2D .HP D2D Backup System user guide (EH985-90907, March 2011) - Page 190
The process checks that media is loaded in the attached tape storage device and that it is blank.
![]() |
View all HP D2D manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 190 highlights
2. Click on Next to display the second page of the wizard. (Or report an error if no tape storage devices are currently attached to the HP D2D Backup System.) 3. Select the attached tape storage device from the pull-down list, the required physical slot if it is a tape library, the required verify/compare option and whether the physical cartridge should be unloaded after the operation completes. NOTE: A Full Verify reads the data back after copy and compares it byte-by-byte with the original. A Quick Verify also reads back the data, but only ensures that it can be read. It may save some time if another tape device on the HP D2D Backup System is being accessed at the same time as the copy operation. No Verify is the fastest option. NOTE: On physical tape libraries the unload after completion option moves the cartridge to the mail slot if the mail slot is enabled and empty. 4. Click Create. 5. The process checks that media is loaded in the attached tape storage device and that it is blank. If it is not blank, you are given the option of overwriting it or canceling the job. (It is not possible to append data.) It also checks that there is cartridge data to be copied (it may have been subsequently moved by the backup application). NOTE: In the case of libraries some of these checks can only be made after loading the cartridge in a tape drive, which takes approximately one minute. 6. The Job Status page is displayed and you can view progress in the final column. 190 Extra information for G1 products
![](/manual_guide/products/hewlettpackard-d2d-hp-d2d-backup-user-guide-eh98590907-2011-eaac11f/190.png)