HP DL320 HP ProLiant DL320 Generation 2 Server Setup and Installation Guide - Page 52

Server Installation, Server Installation Procedures, Measuring with the Template

Page 52 highlights

4 Server Installation Server Installation Procedures To install the rack-mounted server into a Compaq branded rack, complete the procedures described in the following subsections: Measuring with the Template The template is two-sided (front and back) and printed with arrows that show where items will be inserted, both for the fixed rack rails and for the thumbscrews that secure the server faceplate to the front of the rack. CAUTION: Always mount the heaviest item on the bottom of the rack, and work from the bottom to the top. IMPORTANT: Determine the server's place in the rack before starting installation of the fixed rack rails. Refer to the Rack Builder report that was printed during planning of the rack configuration. HP ProLiant DL320 Generation 2 Server Setup and Installation Guide 4-1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139

4
Server Installation
Server Installation Procedures
To install the rack-mounted server into a Compaq branded rack, complete the
procedures described in the following subsections:
Measuring with the Template
The template is two-sided (front and back) and printed with arrows that show where
items will be inserted, both for the fixed rack rails and for the thumbscrews that
secure the server faceplate to the front of the rack.
CAUTION:
Always mount the heaviest item on the bottom of the rack, and work from
the bottom to the top.
IMPORTANT:
Determine the server’s place in the rack
before
starting installation of the fixed
rack rails. Refer to the Rack Builder report that was printed during planning of the rack
configuration.
HP ProLiant DL320 Generation 2 Server Setup and Installation Guide
4-1