Route the cables to the side of the rack. Refer to for an example., clamp in place 2.
UPC - 829160513218
View all HP DL320 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 65 highlights
Server Installation 3. Close the cable clamp (1) and tighten the clamp thumbscrews to hold the cable clamp in place (2). Figure 4-12: Closing the cable clamp on routed cables 4. Route the cables to the side of the rack. Refer to Figure 4-13 for an example. Figure 4-13: Multiple servers installed in a rack with properly routed cabling 4-14 HP ProLiant DL320 Generation 2 Server Setup and Installation Guide
Server Installation
3.
Close the cable clamp (1) and tighten the clamp thumbscrews to hold the cable
clamp in place (2).
Figure 4-12: Closing the cable clamp on routed cables
4.
Route the cables to the side of the rack. Refer to Figure 4-13 for an example.
Figure 4-13: Multiple servers installed in a rack with
properly routed cabling