HP DL320 HP ProLiant DL320 Generation 2 Server Setup and Installation Guide - Page 65

Route the cables to the side of the rack. Refer to for an example., clamp in place 2.

Page 65 highlights

Server Installation 3. Close the cable clamp (1) and tighten the clamp thumbscrews to hold the cable clamp in place (2). Figure 4-12: Closing the cable clamp on routed cables 4. Route the cables to the side of the rack. Refer to Figure 4-13 for an example. Figure 4-13: Multiple servers installed in a rack with properly routed cabling 4-14 HP ProLiant DL320 Generation 2 Server Setup and Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139

Server Installation
3.
Close the cable clamp (1) and tighten the clamp thumbscrews to hold the cable
clamp in place (2).
Figure 4-12: Closing the cable clamp on routed cables
4.
Route the cables to the side of the rack. Refer to Figure 4-13 for an example.
Figure 4-13: Multiple servers installed in a rack with
properly routed cabling
4-14
HP ProLiant DL320 Generation 2 Server Setup and Installation Guide