HP Server rp7420 HP 9000 rp7420 Server - User Service Guide, Fifth Edition - Page 66
continued, Make entry in Gold Book
View all HP Server rp7420 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 66 highlights
Table 4-2 Factory-Integrated Installation Checklist (continued) PROCEDURE Verify presence of cells Power on cabinet (48 V) Verify system configuration and set boot parameters Set automatic system restart Boot partitions Configure remote login (if required). See Appendix B. Verify remote link (if required) Install non-factory, integrated I/O cards (if required) Select PCI card slot Install PCI card Verify installation Route cables using the cable management arm Install other peripherals (if required) Perform visual inspection and complete installation Set up network services (if required) Enable iCOD (if available) Final inspection of circuit boards Final inspection of cabling Area cleaned and debris and packing materials disposed of Account for tools Dispose of parts and other items Make entry in Gold Book (recommended) Customer acceptance and signoff (if required) IN-PROCESS COMPLETED 66 Cabling and Powering the Server