Hikvision ERI-Q108-P8 User Manual - Page 93

Sensitivity, Apply

Page 93 highlights

ERI-Q10x-Px NVR User Manual • Sensitivity: Range [1-100]. The higher the value, the more easily the detection alarm is triggered. • Click OK to save the rule settings and return to the line crossing detection settings interface. Figure 8-13 Set Line Crossing Detection Rules 7. Click and set two points in the preview window to draw a virtual line. 8. Use to clear the existing virtual line and re-draw it. Up to four rules can be configured. Figure 8-14 Draw Line for Line Crossing Detection 9. Click Apply to activate the settings. UM ERI-Q10x-Px 030118NA 92

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147

ERI-Q10x-Px NVR User Manual
UM ERI-Q10x-Px 030118NA
92
Sensitivity:
Range [1-100]. The higher the value, the more easily the detection alarm is triggered.
Click
OK
to save the rule settings and return to the line crossing detection settings interface.
Set Line Crossing Detection Rules
Figure 8-13
Click
and set two points in the preview window to draw a virtual line.
7.
Use
to clear the existing virtual line and re-draw it.
8.
Up to four rules can be configured.
Draw Line for Line Crossing Detection
Figure 8-14
Click
Apply
to activate the settings.
9.