IBM 86605SU Maintenance Manual - Page 238
Preparing the Rack, IBM Installation Template
![]() |
UPC - 087944475767
View all IBM 86605SU manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 238 highlights
Preparing the Rack 32 kg (70.5 lbs) 55 kg (121.2 lbs) Caution Use safe lifting practices when lifting your machine. In this section, you will use the following parts: IBM Installation Template Two slide-bracket assemblies One cable-management arm Two bezel brackets Six screws (for attaching the bezel brackets) Sixteen long screws (M6 by 16 mm) Eight short screws (M4 by 8 mm) Six cage nuts Two hex nuts (M6) Four lift handles (shipped with some servers) Cable ties One server bracket (for attaching the cable management arm to the server) Attention To ensure rack stability, plan the installation of servers in the rack starting from the bottom. To attach the mounting hardware to the rack: 1. Remove the rack front door. Refer to the rack documentation for instructions. 2. Mark the positions of the slide-bracket assemblies, bezel brackets, and the cable-management arm on the rack: a. Position the installation template on the front mounting rails on the rack, aligning the holes. b. Mark the holes for the slide-bracket assemblies and bezel brackets. c. Move the template to the same U level at the rear of the server and mark the locations for the slide-bracket assemblies and cable-management arm. d. Install the six cage nuts at the locations marked on the mounting rails. Netfinity 5500 - Type 8660 233
![](/manual_guide/products/ibm-86605su-maintenance-manual-e887055/238.png)