IBM 86605SU Maintenance Manual - Page 255
Server Cabling, Connect the power cord
UPC - 087944475767
View all IBM 86605SU manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 255 highlights
Server Cabling Make sure you have an adequate number of properly grounded electrical outlets for your server, monitor, and any other options that you installed. Place your server in a location that is dry. Rain or spilled liquids might damage your server. Leave about 50 mm (2 inches) of space at the right and left sides of your server to allow the server's cooling system to work properly. Leave about 100 mm (4 inches) clearance at the rear for cables. 1. Use the illustration in "Input/Output Connectors and Expansion Slots" on page 194 to cable your server. 2. Remove any shipping screws 2 from the power supply. 3. Connect the power cord 1 to the server. Caution. When the power-cord strain-relief bracket option is installed on the power cord, the server must be plugged to a power source that is easily accessible. 4. Install the power-cord strain-relief bracket 3 (if desired). 5. Plug the power cord into a properly grounded electrical outlet. 250 Netfinity Server HMM