Konica Minolta PKG-675i PKG-675i User Manual - Page 32

Version 3.0 100/120 V AC

Page 32 highlights

OPERATIONAL MANUAL 2.3. Electrical connection requirements Version 2.2 • Machine power: Plug CEE 7/7 (1P+N+E Male 16 Amp.); • Installation power: Socket Type F (1P+N+E Female 16 Amp.); • Machine main circuit protection: Differential Switch 2P, 25 Amp., 300 mA, 10 KA, C; • Circuit protection at installations (recommended): Circuit Breaker 2P, 32 Amp., 20 KA, C; • Frequency: 50/60 Hz; • Operational voltage: 220-240V AC; • Machine power consumption: 3500 Watts. Version 3.0 (100/120 V AC) • Machine power plug: NEMA 5-15P; • Installation power plug: NEMA 5-15R; • Machine main circuit protection: Circuit breaker C60BP 1P 10A curve C; • Circuit protection at installations (recommended): Circuit Breaker 2P, 25A; • Machine power consumption: 3500 Watts. • The original machine cable is 2 meters long. Please ensure that you have a plug near enough to connect it. 2.4. Electrical safety requirements When conducting the machine installation operations, the operators must have access to coat, lab coat (or other protective clothing) and rubber or latex gloves. Certified personnel are required for the electrical work. DOCUMENT I 18.40V02 - Update: 04.09.2019 Page 32

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118

DOCUMENT
I 18.40V02 -
Update: 04.09.2019
Page 32
OPERATIONAL MANUAL
2.3.
Electrical connection requirements
Version 2.2
Machine power
: Plug CEE 7/7 (1P+N+E Male 16 Amp.);
Installation power
: Socket Type F (1P+N+E Female 16 Amp.);
Machine main circuit protection
: Differential Switch 2P, 25 Amp., 300 mA, 10 KA, C;
Circuit protection at installations (recommended)
: Circuit Breaker 2P, 32 Amp., 20 KA, C;
Frequency:
50/60 Hz;
Operational voltage:
220-240V AC;
Machine power consumption
: 3500 Watts.
Version 3.0 (100/120 V AC)
Machine power plug
: NEMA 5-15P;
Installation power plug
: NEMA 5-15R;
Machine main circuit protection
: Circuit breaker C60BP 1P 10A curve C;
Circuit protection at installations (recommended)
: Circuit Breaker 2P, 25A;
Machine power consumption
: 3500 Watts.
The original machine cable is 2 meters long. Please ensure that you
have a plug near enough to connect it.
2.4.
Electrical safety requirements
When conducting the machine installation operations, the operators must have access to coat, lab coat (or other
protective clothing) and rubber or latex gloves.
Certified personnel are required for the electrical work.