Miele TXI 680 WP Eco and Steam Operating instructions/Installation instruction - Page 75

Installation, Leveling the tumble dryer, Downtime after installation, Ventilation

Page 75 highlights

*INSTALLATION* Installation Installation Leveling the tumble dryer  Ensure that no closeable door, sliding door, or an oppositely hinged door is installed that would hinder the door of the dryer being opened in any way. Downtime after installation  Damage caused by switching the appliance on too soon. This can damage the heat pump. After setting up the tumble dryer, wait for at least one hour before starting a drying program. Ventilation The cool air intake at the front of the dryer must not be blocked or covered. This would hinder a sufficient intake of cool air for the heat exchanger. The appliance must stand perfectly level to ensure safe and proper operation. Do not block the gap between the bottom of the tumble dryer and the floor with toe kicks, deep pile carpet, etc. This would otherwise hinder a sufficient flow of air to the tumble dryer. The hot air that is blown out from the heat exchanger warms the room air. Ensure sufficient ventilation of the room, e.g., open the window. The drying time will otherwise take longer (higher energy requirement). The screw feet can be adjusted to compensate for unevenness in the floor. 75

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100

Installation
75
Installation
Leveling the tumble dryer
Ensure that no closeable door,
sliding door, or an oppositely hinged
door is installed that would hinder
the door of the dryer being opened in
any way.
The appliance must stand perfectly
level to ensure safe and proper opera-
tion.
The screw feet can be adjusted to com-
pensate for unevenness in the floor.
Downtime after installation
Damage caused by switching the
appliance on too soon.
This can damage the heat pump.
After setting up the tumble dryer,
wait for at least one hour before
starting a drying program.
Ventilation
The cool air intake at the front of the
dryer must not be blocked or cov-
ered. This would hinder a sufficient
intake of cool air for the heat ex-
changer.
Do not block the gap between the
bottom of the tumble dryer and the
floor with toe kicks, deep pile carpet,
etc. This would otherwise hinder a
sufficient flow of air to the tumble
dryer.
The hot air that is blown out from the
heat exchanger warms the room air. En-
sure sufficient ventilation of the room,
e.g., open the window. The drying time
will otherwise take longer (higher energy
requirement).