Netgear XSM4324FS Hardware Installation Guide - Page 65

Replace a power supply unit

Page 65 highlights

M4300 Intelligent Edge Series Fully Managed Stackable Switches Replace a power supply unit You can replace a power supply unit (PSU). If your switch includes a second power module bay in which a PSU is installed, you can replace the PSU while the switch remains powered on and functioning. The figures in the following procedure show models M4300-24X24F and M4300-24X. To remove one PSU and reinstall another PSU in the same power module bay: 1. If your switch functions with a single PSU only, disconnect the power cord from the PSU and let the switch power down. If your switch functions with two PSUs, you do not need to power down the switch and can perform a hot swap. 2. Remove the PSU from the power module bay by moving the release latch to the left and pulling the extraction handle. 3. Insert the other PSU into the power module bay, and gently push the PSU into the bay until the latch locks. Maintenance and Troubleshooting 65 Hardware Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69

Replace a power supply unit
You can replace a power supply unit (PSU). If your switch includes a second power
module bay in which a PSU is installed, you can replace the PSU while the switch remains
powered on and functioning. The figures in the following procedure show models
M4300-24X24F and M4300-24X.
To remove one PSU and reinstall another PSU in the same power module bay:
1.
If your switch functions with a single PSU only, disconnect the power cord from the
PSU and let the switch power down.
If your switch functions with two PSUs, you do not need to power down the switch
and can perform a hot swap.
2.
Remove the PSU from the power module bay by moving the release latch to the left
and pulling the extraction handle.
3.
Insert the other PSU into the power module bay, and gently push the PSU into the
bay until the latch locks.
Hardware Installation Guide
65
Maintenance and
Troubleshooting
M4300 Intelligent Edge Series Fully Managed Stackable Switches