Brother International BAS-760 Instruction Manual - English - Page 18

Fffittot/9, Bobbin, Counter, Alarm, Piece, L&t7, Speed, N\l'iie*11, Change

Page 18 highlights

[Bobbin counter setting] * Set up the producible quantity with the lower thread amount wound on the bobbin in the case. * Modification is possible only when the production quantity is displayed in the shunting position. *The producible piece number can be monitored by using the READ button. (1) Press READ button 0, and the producible piece number will be displayed. (2) Set up the producible number at BOBBIN FffiTTOT/9- 1 BOBBIN COUNTER Bobbin COUNTER switch O. (3) Press SET button 0 to complete setting. Lower thread amount Press SET button 0 when setting the same quantity after changing the bobbin. Check if the display shows the set-up quantity. 1F7FD,x1SET O pj - L - 1ALARM CODE * The maximum setting valve is 399; even if a larger valve is input, the setting is fixed at 399. 7 TINA% READ 1 PIECE COUNTER 1960 (4) When the bobbin counter setting display "0" after sewing, the machine head moves toward you (bobbin change position). After changing the bobbin, the counter will be set automatically. [Setting the PIECE COUNTER and the sewing speed] *Settings can be modified only when the production quantity is displayed with the machine in the shunting position. *The bobbin counter setting and piece counter setting are stored even after the power switch is turned off. COUNTER DEC FAST P5 - LTh- hr. ALARM CODE l&t7 -.129PIECE COUNTER SP SPEED ;5 7 2 4 x1000 n\L'iiE*11% BOBBIN CHANGE Setting the production quantity (1) The PIECE COUNTER is reset to display "0" when COUNTER DEC button m and FAST button pressed simultaneously. (2) Each time COUNTER DEC button (D is pressed once, the displayed value will decrease. >K Additions to the value are not available. 0 are Sewing speed Set sewing speed by turning the SPEED selector p before starting. Ex. Maximum speed for core-spun thread: 4,000 spm Maximum speed for polyester, spun thread: 3,500 spm X The sewing speed cannot be changed during the sewing operation, except after an interruption. -15-

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

[Bobbin
counter
setting]
*
Set
up
the
producible
quantity
with
the
lower
thread
amount
wound
on
the
bobbin
in
the
case.
*
Modification
is
possible
only
when
the
production
quantity
is
displayed
in
the
shunting
position.
*The
producible
piece
number
can
be
monitored
by
using
the
READ
button.
(1)
Press
READ
button
0,
and
the
producible
piece
number
will
be
displayed.
(2)
Set
up
the
producible
number
at
BOBBIN
COUNTER
switch
O.
(3)
Press
SET
button
0
to
complete
setting.
Press
SET
button
0
when
setting
the
same
quantity
after
changing
the
bobbin.
Check
if
the
display
shows
the
set-up
quantity.
*
The
maximum
setting
valve
is
399;
even
if
a
larger
valve
is
input,
the
setting
is
fixed
at
399.
7
(4)
When
the
bobbin
counter
setting
display
"0"
after
sewing,
the
machine
head
moves
toward
you
(bobbin
change
position).
After
changing
the
1
bobbin,
the
counter
will
be
set
automatically.
FffiTTOT/9
-
1
BOBBIN
COUNTER
1
F7FD
,
x1-
SET
TINA%
READ
Bobbin
Lower
thread
amount
O
pj
-
L
-
1-
ALARM
CODE
PIECE
COUNTER
COUNTER
1960
[Setting
the
PIECE
COUNTER
and
the
sewing
speed]
*Settings
can
be
modified
only
when
the
production
quantity
is
displayed
with
the
machine
in
the
shunting
position.
*The
bobbin
counter
setting
and
piece
counter
setting
are
stored
even
after
the
power
switch
is
turned
off.
COUNTER
DEC
FAST
P5
-
LTh
-
hr.
ALARM
CODE
l&t7
.1
-29
-
PIECE
COUNTER
S
P
SPEED
;
5
2
7
4
x1000
n\L'iiE*11%
BOBBIN
CHANGE
Setting
the
production
quantity
(1)
The
PIECE
COUNTER
is
reset
to
display
"0"
when
COUNTER
DEC
button
m
and
FAST
button
0
are
pressed
simultaneously.
(2)
Each
time
COUNTER
DEC
button
(D
is
pressed
once,
the
displayed
value
will
decrease.
>K
Additions
to
the
value
are
not
available.
Sewing
speed
Set
sewing
speed
by
turning
the
SPEED
selector
p
before
starting.
Ex.
Maximum
speed
for
core
-spun
thread:
4,000
spm
Maximum
speed
for
polyester,
spun
thread:
3,500
spm
X
The
sewing
speed
cannot
be
changed
during
the
sewing
operation,
except
after
an
interruption.
—15-