Haier 3U19FS1ERA Service Manual - Page 66
Installation procedure
View all Haier 3U19FS1ERA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 66 highlights
>_]]VbTZR\ _^UZdZ_^Vb 5. Installation procedure 1. Drill a hole in the wall and insert the connecting pipe and wire through a PVC wall-through tube purchased locally. The wall hole shall be with a outward down slope of at least 1/100. (See Figure 1) 2. Before drilling check that there is no pipe or reinforcing bar just behind the drilling position. Drilling shall avoid at positions with electric wire or pipe. 3. Mount the unit on a strong and horizontal building roof. If the base is not firm, it will cause noise, vibration or pipe broken and refrigerant leakage (see Figure 6). 4. Support the unit firmly. 5. Change the form of the connection pipe, connection wire and drain pipe so that they can go through the wall hole easily. Fig 1 When installing the ceiling concealed type indoor unit, a specially designed return air bellows shall be installed, as shown in Figure 3, Figure 4. Figure 3 Installing building roof 0.5m(0Pa)or 5m(50Pa) A Ceiling Unit Air supply Air outlet duct Return air bellows Return air Figure 4 Air outlet grille Return air bellows Air supply No obstacles within 1 m(0Pa) Unit Return air Each air return and supply duct should fix to the floor precast slab by using an iron stand. Use glue to seal the interface closely. Recommend the distance between the air return duct and the wall is more than 150mm. -65-