Haier 3U19FS1ERA Service Manual - Page 83
Defrosting operation flow chart
View all Haier 3U19FS1ERA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 83 highlights
3.6.4 Defrosting operation flow chart beginning >_]]VbTZR\ _^UZdZ_^Vb end fixed frequency indicated FQY 60s compressor 0HZ 5s outdoor motor ON defrosting FQY 80 Hz(E) send defrosting signal to indoor 60s soft startup 0HZ Auto OFF 4-way valve ON OFF 15s 450-pulse all EEVs auto open angle all indoor motors ON OFF 350-pulse(E) 450-pulse auto open angle anti-cold air function 3.7Frequency control when Td is too high Purpose: make compressor frequency control if the discharging temp. is too high, to lower the discharging temp. efficiently and ensure the system can run normally. 120℃ If keeping for 10s, the unit stops, 3 minutes later, the unit can re-startup. If in 60 minutesthe unit occurs alarm for 3 times, the failure can be eliminated. Discharging temp. TD 115℃ Reduce FQY rapidly 2HZ/S 110℃ Reduce FQY rapidly 1HZ/S 105℃ Reduce FQY slowly 1HZ/10S 100℃ Remain FQY 95℃ Increase FQY slowly 1HZ/10S -82-