Haier 3U19FS1ERA Service Manual - Page 69
Requirements
View all Haier 3U19FS1ERA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 69 highlights
Original concrete slab Use hole hinge, hole plunger or hole bolt. >_]]VbTZR\ _^UZdZ_^Vb Steel reinforcement structure Use steel angle or new support steel angle directly. Hanging bolt Suspension screw Support steel angle Hanging of the indoor unit Fasten the nut on the suspension screw and then hang the suspension screw in the Tslot of the suspension part of the unit. Aided with a level meter, adjust level of the unit within 5 mm. CAUTION In order to drain water normally, the drain pipe shall be processed as specified in the installation manual and shall be thermal insulated to avoid dew generation. Improper hose connection may cause indoor water leakage. Requirements The indoor drain pipe shall be thermal insulated. The connection part between the drain pipe and the indoor unit shall be insulated so as to prevent dew generation. The drain pipe shall be slant downwards (greater than 1/100). The middle part shall not be of Stype elbow, otherwise abnormal sound will be produced. The horizontal length of the drain pipe shall be less than 20 m. In case of long pipe, supports shall be provided every 1.5 2m to prevent wavy form. Central piping shall be laid out according to the following figure. Take care not to apply external force onto the drain pipe connection part. 1.5m~2m Support Insulation (supplied by the user) Down slope above 1/100 S type elbow To the largest (app. 10cm) Wall Outside Slant VP30 Down slope above 1/100 Drain pipe (supplied by the user) -68-