HP BL10e HP ProLiant BL e-Class System Setup and Installation Guide - Page 48
Inserting the front of the rack rail and, engaging the locking gear
UPC - 808736933599
View all HP BL10e manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 48 highlights
Installing and Cabling the System 6. Compress the spring-loaded rack rail toward the rear of the rack (1). 7. Using the marks you made when measuring with the template, align the front of the right rail with the holes and release the rail, allowing it to lock into position (2). 8. Engage the locking gear (3). 2 3 1 Figure 3-9: Inserting the front of the rack rail and engaging the locking gear CAUTION: Rack rails must be installed as tightly as possible. Failure to obtain a correct fit may result in damage to equipment. Once the right rack rail is properly installed, begin installation of the left rack rail. 3-10 HP ProLiant BL e-Class System Setup and Installation Guide
Installing and Cabling the System
6.
Compress the spring-loaded rack rail toward the rear of the rack (1).
7.
Using the marks you made when measuring with the template, align the front of
the right rail with the holes and release the rail, allowing it to lock into
position (2).
8.
Engage the locking gear (3).
3
2
1
Figure 3-9:
Inserting the front of the rack rail and
engaging the locking gear
CAUTION:
Rack rails must be installed as tightly as possible. Failure to obtain a
correct fit may result in damage to equipment.
Once the right rack rail is properly installed, begin installation of the left rack rail.
3-10
HP ProLiant BL e-Class System Setup and Installation Guide