HP StorageWorks 2/16V HP StorageWorks SAN Switch 2/8V, 2/16V, 2/16N and 4/32 I - Page 84

Table 21, Optional step: issue

Page 84 highlights

CAUTION: Do not force the installation. If the power supply does not slide in easily, make sure that it is correctly oriented before continuing. c. Secure the power supply to the chassis by tightening the captive screw using the Phillips-head screwdriver. 7. Plug the power cord into the power supply and press the AC power switch to turn it on. 8. Verify that the LED on the new power supply displays a steady green light while the switch is operating (see Table 21). If the LED is not green, ensure that the power supply is firmly installed. 9. Optional step: issue the psShow command at the CLI prompt to display power supply status. Fabric OS identifies the power supplies in a SAN Switch 4/32 from left to right as PS2 and PS1,as shown in Figure 25. 84 Installing field-replaceable units

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126

Installing field-replaceable units
84
CAUTION:
Do not force the installation. If the power supply does not slide in easily, make
sure that it is correctly oriented before continuing.
c.
Secure the power supply to the chassis by tightening the captive screw using the
Phillips-head screwdriver.
7.
Plug the power cord into the power supply and press the AC power switch to turn it on.
8.
Verify that the LED on the new power supply displays a steady green light while the switch
is operating (see
Table 21
). If the LED is not green, ensure that the power supply is firmly
installed.
9.
Optional step: issue the
psShow
command at the CLI prompt to display power supply
status. Fabric OS identifies the power supplies in a SAN Switch 4/32 from left to right as
PS2
and
PS1,
as shown in
Figure 25
.