HP rp7440 User Service Guide, Fourth Edition - HP Integrity rx7640 and HP 9000 - Page 76

Connecting the CE Tool to the Local RS232 Port on the MP, Turning on Housekeeping Power and Logging

Page 76 highlights

3. Select Com1. 4. Check the settings and change, if required. Go to More Settings to set Xon/Xoff. Click OK to close the More Settings window. 5. Click OK to close the Connection Setup window. 6. Pull down the Setup menu and select Terminal (under the Emulation tab). 7. Select the VT100 HP terminal type. 8. Click Apply. This option is not highlighted if the terminal type you want is already selected. 9. Click OK. Connecting the CE Tool to the Local RS232 Port on the MP This connection enables direct communications with the MP. Only one window can be created on the CE Tool to monitor the MP. When enabled, it provides direct access to the MP and any partition. Use the following procedure to connect the CE Tool to the Local RS-232 Port on the MP: 1. Connect one end of a null modem cable (9-pin to 9-pin) (Part Number 5182-4794) to the cable connector labeled CONSOLE. 2. Connect the other end of the RS-232 cable to the CE Tool. Turning on Housekeeping Power and Logging in to the MP After connecting the serial device, it is possible to log in to the Management Processor (MP). +3.3 DC Housekeeping power (HKP) (also known as standby power) is active as soon as AC power is applied to the server. As the MP uses housekeeping power, it is possible to log in to the MP even when the power switch is in the OFF position. The power switch is a DC power switch that controls +48V DC. Before powering up the server for the first time: 1. Verify that the AC voltage at the input source is within specifications for each server being installed. 2. If not already done so, power on the serial display device. The preferred tool is the CE tool running Reflection 1. To set up a communications link and log in to the MP: 1. Apply power to the server cabinet. On the front of the server, a solid green Power LED and a solid green MP Status LED will illuminate after about 30 seconds. Refer to Figure 3-29. Figure 3-29 Front Panel Display 2. Check the bulk power supply LED for each BPS. When on, the breakers distribute power to the BPSs. AC power is present at the BPSs: • When power is first applied. The BPS LEDs will be flashing amber. • After 30 seconds has elapsed. The flashing amber BPS LED for each BPS becomes a flashing green LED. 76 Installing the Server

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195

3.
Select
Com1
.
4.
Check the settings and change, if required.
Go to
More Settings
to set Xon/Xoff. Click
OK
to close the More Settings window.
5.
Click
OK
to close the Connection Setup window.
6.
Pull down the
Setup
menu and select
Terminal
(under the
Emulation
tab).
7.
Select the VT100 HP terminal type.
8.
Click
Apply
.
This option is not highlighted if the terminal type you want is already selected.
9.
Click
OK
.
Connecting the CE Tool to the Local RS232 Port on the MP
This connection enables direct communications with the MP.
Only one window can be created
on the CE Tool to monitor the MP. When enabled, it provides direct access to the MP and any
partition.
Use the following procedure to connect the CE Tool to the Local RS-232 Port on the MP:
1.
Connect one end of a null modem cable (9-pin to 9-pin) (Part Number 5182-4794) to the cable
connector labeled CONSOLE.
2.
Connect the other end of the RS-232 cable to the CE Tool.
Turning on Housekeeping Power and Logging in to the MP
After connecting the serial device, it is possible to log in to the Management Processor (MP). +3.3
DC Housekeeping power (HKP) (also known as standby power) is active as soon as AC power
is applied to the server. As the MP uses housekeeping power, it is possible to log in to the MP
even when the power switch is in the OFF position. The power switch is a DC power switch that
controls +48V DC.
Before powering up the server for the first time:
1.
Verify that the AC voltage at the input source is within specifications for each server being
installed.
2.
If not already done so, power on the serial display device.
The preferred tool is the CE tool running Reflection 1.
To set up a communications link and log in to the MP:
1.
Apply power to the server cabinet.
On the front of the server, a solid green
Power
LED and a solid green
MP Status
LED will
illuminate after about 30 seconds. Refer to
Figure 3-29
.
Figure 3-29 Front Panel Display
2.
Check the bulk power supply LED for each BPS.
When on, the breakers distribute power to the BPSs. AC power is present at the BPSs:
When power is first applied. The BPS LEDs will be flashing amber.
After 30 seconds has elapsed. The flashing amber BPS LED for each BPS becomes a
flashing green LED.
76
Installing the Server