Casio QT 6600 Reference Manual - Page 129
Z collection / consolidation processing
![]() |
View all Casio QT 6600 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 129 highlights
3-6-3-2. Z collection / consolidation processing Z collection/consolidation processing is performed as the figure shown below. Satellite 1, 7 Master Terminal files Terminal files 3 2 2 Consolidation 6 work 4 Consolidation files NOTE: 1 A Z collection / consolidation command is started up from the master terminal. The master first locks an objected terminal. (Z lock) 2 Data of the objected terminal file are sent to the master terminal, and are copied to the consolidation work file. 3 The data in the consolidation work file are reported on the master's printer. 4 The data in the consolidation work file is added to the consolidation file. 5 After the master terminal's processing completes, the same processes described in item 1 to 4 are executed for all other terminals. 6 The data accumulated in the consolidation file are reported on the master's printer. 7 After the above collection processing completes for all terminals, the files of all satellite terminals are cleared, and then satellite's Z lock statuses are released. • Even if an error is occurred, or if the processing is terminated, the data to be collected remains as they are, and Z lock statuses are automatically released. Therefore, retrying the same operation can be performed. QT-6600 Reference Manual R-129
![](/manual_guide/products/casio-qt-6600-reference-manual-1677160/129.png)