Dell Brocade 6520 Brocade 6520 Hardware Referencce Manual - Page 36
Diagnostic tests, Brocade 6520 management
View all Dell Brocade 6520 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 36 highlights
3 Brocade 6520 management FIGURE 6 Installing an 8 Gbps SFP+ in the upper row of port slot Diagnostic tests In addition to POST, Fabric OS includes diagnostic tests to help you troubleshoot the hardware and firmware. This includes tests of internal connections and circuitry, fixed media, and the transceivers and cables in use. The tests are implemented by command, either through a Telnet session or through a serial console connection to the switch. Some tests require the ports to be connected by external cables, to allow diagnostics to verify the serializer/deserializer interface, transceiver, and cable. Some tests require loopback plugs. Diagnostic tests run at link speeds of 2, 4, 8, 10, or 16 Gbps depending on the speed of the link being tested and the type of port. NOTE Diagnostic tests might temporarily lock the transmit and receive speed of the links during diagnostic testing. For information about specific diagnostic tests, refer to the Fabric OS Troubleshooting and Diagnostics Guide. Brocade 6520 management You can use the management functions built into the Brocade 6520 to monitor the fabric topology, port status, physical status, and other information to help you analyze switch performance and to accelerate system debugging. The Brocade 6520 automatically performs power-on self-test (POST) each time it is turned on. Any errors are recorded in the system error log. For more information about POST, refer to "POST and boot-up specifications" on page 21. 24 Brocade 6520 Hardware Reference Manual 53-1002705-01