HP Color LaserJet Managed MFP E77822-E77830 On-Site Installation Guide - Page 21

Logistics worksheet continued, Table 3-2

Page 21 highlights

Table 3-2 Logistics worksheet (continued) Yes/No Remarks/Data Is the delivery of the unit on the same floor as receiving? If no, is an elevator used? Please identify below. ❑ Yes ❑ No Note that stair climbers are not currently approved for moving MFP printers. If needed, lift or hoist the MFP printers in their crates and keep them in an upright position. If no elevator is to be used, how is the unit to be delivered? What is the distance in meters from the receiving area to the planned copier location? (optional) Do the dimensions of doorways and hallways along the delivery path meet minimum system dimensional requirements? Is there a clear path to the planned delivery location? ❑ Yes The box for the main MFP unit requires a doorway opening of 765 mm (30.1 in). ❑ No See Size and weight specifications on page 20 for complete information about box dimensions. ❑ Yes ❑ No Is the copier room level with floor? If no, is there a ramp? ❑ Yes ❑ No Are their enough people to lift the ❑ Yes engine assembly? (required) ❑ No The engine assembly is heavy and requires four people to lift onto the stand or DCF. Is there a possibility to discard packaging materials at customer site? (optional) ❑ Yes ❑ No ENWW Logistics information 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106

Table 3-2
Logistics worksheet (continued)
Yes/No
Remarks/Data
Is the delivery of the unit on the
same floor as receiving? If no, is
an elevator used? Please identify
below.
If no elevator is to be used, how is
the unit to be delivered?
What is the distance in meters
from the receiving area to the
planned copier location?
(optional)
Yes
No
Note that stair climbers are not currently approved for moving MFP printers. If needed,
lift or hoist the MFP printers in their crates and keep them in an upright position.
Do the dimensions of doorways
and hallways along the delivery
path meet minimum system
dimensional requirements?
Yes
No
The box for the main MFP unit requires a doorway opening of 765 mm (30.1 in).
See
Size and weight
specifications
on page
20
for complete information about box
dimensions.
Is there a clear path to the
planned delivery location?
Yes
No
Is the copier room level with
floor?
If no, is there a ramp?
Yes
No
Are their enough people to lift the
engine assembly? (required)
Yes
No
The engine assembly is heavy and requires four people to lift onto the stand or DCF.
Is there a possibility to discard
packaging materials at customer
site? (optional)
Yes
No
ENWW
Logistics information
15