HP ProLiant DL980 DL980 G7 Maintenance & Service Guide - Page 71
Lower the handle, and then extend the processor memory drawer from the server until the release
View all HP ProLiant DL980 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 71 highlights
IMPORTANT: When either optional I/O expansion board in installed in a two-processor configuration, the second processor must be installed in socket 3. 1. Power down the server (on page 26). 2. Extend the server from the rack. 3. Remove the access panel (on page 28). 4. Release the latches on the release lever. 5. Lower the handle, and then extend the processor memory drawer from the server until the release latches catch. 6. Remove any expansion boards from the failed I/O expansion board ("Non-hot-plug expansion board" on page 61). 7. Remove the I/O expansion board: Illustrated parts catalog 71
Illustrated parts catalog 71
IMPORTANT:
When either optional I/O expansion board in installed in a two-processor
configuration, the second processor must be installed in socket 3.
1.
Power down the server (on page
26
).
2.
Extend the server from the rack.
3.
Remove the access panel (on page
28
).
4.
Release the latches on the release lever.
5.
Lower the handle, and then extend the processor memory drawer from the server until the release
latches catch.
6.
Remove any expansion boards from the failed I/O expansion board ("
Non-hot-plug expansion
board
" on page
61
).
7.
Remove the I/O expansion board: