HP Integrity rx8620 Installation Guide, Sixth Edition - HP Integrity rx8620 Se - Page 65

Cabling and Power Up, Voltage Check

Page 65 highlights

Installation Cabling and Power Up Cabling and Power Up After the system has been unpacked and moved into position, it must be connected to a source of AC power. The AC power must be checked for the proper voltage before the system is powered up. This chapter describes these activities. Voltage Check This section provides voltage check information for use on the customer site. The emphasis is on measuring the voltages at the power cord plug end specified as an IEC-320 C19 type plug. This is the end that plugs directly into the back of the server cabinet. NOTE These procedures need to be performed for each power cord that will be plugged directly into the back of the server cabinet. If the expected results from this procedure are not observed during the voltage check, refer to the section titled "Voltage Check (Additional Procedure)" on page 69. Chapter 2 65

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96

Chapter 2
Installation
Cabling and Power Up
65
Cabling and Power Up
After the system has been unpacked and moved into position, it must be connected to a source of AC power.
The AC power must be checked for the proper voltage before the system is powered up. This chapter describes
these activities.
Voltage Check
This section provides voltage check information for use on the customer site. The emphasis is on measuring
the voltages at the power cord plug end specified as an IEC-320 C19 type plug. This is the end that plugs
directly into the back of the server cabinet.
NOTE
These procedures need to be performed for each power cord that will be plugged directly into
the back of the server cabinet. If the expected results from this procedure are not observed
during the voltage check, refer to the section titled “Voltage Check (Additional Procedure)” on
page 69.