HP Integrity rx8620 Installation Guide, Sixth Edition - HP Integrity rx8620 Se - Page 93
Table 2-8, Factory-Integrated Installation Checklist Continued Continued, Set LAN IP address on MP
View all HP Integrity rx8620 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 93 highlights
Installation Cabling and Power Up Table 2-8 Factory-Integrated Installation Checklist (Continued) (Continued) PROCEDURE Remove and dispose of packaging material Move cabinet(s) and equipment to computer room Move cabinets into final position Position cabinets next to each other (approx. 1/2 inch) Adjust leveling feet Install anti tip plates Inspect cables for proper installation Set up CE tool and connect to Remote RS-232 port on MP Apply power to cabinet (Housekeeping) Check power to BPSs Log in to MP Set LAN IP address on MP Connect customer console Set up network on customer console Verify LAN connection Verify presence of cells Power on cabinet (48 V) Verify system configuration and set boot parameters Set automatic system restart Boot partitions Configure remote login (if required). See Appendix B. Verify remote link (if required). Install non-factory, integrated I/O cards (if required) IN-PROCESS COMPLETED Chapter 2 93