HP Integrity rx8620 Installation Guide, Sixth Edition - HP Integrity rx8620 Se - Page 78
Fault, Attention, Remote, MP Present, Standby Power, Power, Switch
View all HP Integrity rx8620 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 78 highlights
Installation Cabling and Power Up The preferred tool is the CE Tool running Reflection 1. To power on the MP, set up a communications link, and log in to the MP: 1. Apply power to the server cabinet. Apply power to any other server cabinets that were shipped to the customer site. On the front of the server, a solid green Standby Power, and a solid green MP Present light will illuminate after about 30 seconds. Figure 2-30 Front Panel Display RUN Attention Fault Remote MP Present Standby Power Power Power Switch 2. Check the bulk power supply (BPS) LED for each BPS. See Figure 2-31 for the LED location. When on, the breakers distribute power to the BPS. AC power is present at the BPS: • When power is first applied. Note the BPS LEDs will be flashing amber. • After 30 seconds have elapsed. Note the flashing amber BPS LED for each BPS becomes a flashing green LED. 78 Chapter 2