HP Integrity rx8620 Installation Guide, Sixth Edition - HP Integrity rx8620 Se - Page 85

Configuring AC Line Status, The du Command Screen

Page 85 highlights

Installation Cabling and Power Up To look at a list of the commands available, enter he. You may have to press Enter to see more than one screen of commands. Use the Page Up and Page Down keys to view the previous or next screen of commands. To exit the Help Menu, enter q. 2. From the command prompt (MP:CM>), enter du. The du command displays the MP Bus topology. A screen similar to the following is displayed: Figure 2-37 The du Command Screen There will be an asterisk (*) in the column marked MP. 3. Verify that there is an asterisk (*) for each of the cells installed in the server cabinet, by comparing what is in the Cells column with the cells physically located inside the server cabinet. Figure 2-37 shows that cells are installed in slots 0 and 1 in cabinet 0. In the server cabinet, there should be cells physically located in slots 0 and 1. Configuring AC Line Status Utilities is able to detect if power is applied to each of the AC input cords for the server. This is achieved by sampling the status of the bulk power supplies. During installation, use the following procedure to check the configuration for the AC line status and configure it to match the customer's environment. Step 1. At the MP prompt, enter cm. This will display the command menu and allow for viewing and configuring various utilities controlled by the MP. Chapter 2 85

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96

Chapter 2
Installation
Cabling and Power Up
85
To look at a list of the commands available, enter
he
. You may have to press
Enter
to see more than one
screen of commands. Use the Page Up and Page Down keys to view the previous or next screen of
commands. To exit the Help Menu, enter
q
.
2. From the command prompt (MP:CM>), enter
du
.
The
du
command displays the MP Bus topology. A screen similar to the following is displayed:
Figure 2-37
The du Command Screen
There will be an asterisk
(*)
in the column marked
MP
.
3. Verify that there is an asterisk (*) for each of the cells installed in the server cabinet, by comparing what
is in the
Cells
column with the cells physically located inside the server cabinet.
Figure 2-37 shows that cells are installed in slots 0 and 1 in cabinet 0. In the server cabinet, there should
be cells physically located in slots 0 and 1.
Configuring AC Line Status
Utilities is able to detect if power is applied to each of the AC input cords for the server. This is achieved by
sampling the status of the bulk power supplies. During installation, use the following procedure to check the
configuration for the AC line status and configure it to match the customer’s environment.
Step 1.
At the MP prompt, enter
cm
. This will display the command menu and allow for viewing and
configuring various utilities controlled by the MP.