Cisco NAC3350-PROF-K9 Hardware Installation Guide - Page 60

Adjusting the Slide-rail Length, Step 6

Page 60 highlights

Rack-Mounting Your Cisco NAC Appliance CAM/CAS Figure 2-5 Adjusting the Slide-rail Length Chapter 2 Preparing for Installation 1 Adjustment tab 2 Release tab 3 Pins not extended through the mounting flange and slide rail 4 Pins extended through the mounting flange and slide rail Step 6 Align the pins (see Figure 2-6) on the front rail-locking carrier to the front mounting flange. If you have adjusted the rail length, push the rail-locking carrier back toward the rear of the slide rail to align the slide rail with the mounting flange. Then, press the tab to secure the front of the slide rail to the front mounting flange. Note Ensure that the pins are fully extended through the mounting flange and the slide rail. Step 7 Repeat the steps from 1 to 6 for the other slide rail. 2-18 Cisco NAC Appliance Hardware Installation Guide OL-20326-01

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176

2-18
Cisco NAC Appliance Hardware Installation Guide
OL-20326-01
Chapter 2
Preparing for Installation
Rack-Mounting Your Cisco NAC Appliance CAM/CAS
Figure 2-5
Adjusting the Slide-rail Length
Step 6
Align the pins (see
Figure 2-6
) on the front rail-locking carrier to the front mounting flange. If you have
adjusted the rail length, push the rail-locking carrier back toward the rear of the slide rail to align the
slide rail with the mounting flange. Then, press the tab to secure the front of the slide rail to the front
mounting flange.
Note
Ensure that the pins are fully extended through the mounting flange and the slide rail.
Step 7
Repeat the steps from
1
to
6
for the other slide rail.
1
Adjustment tab
3
Pins not extended through the
mounting flange and slide rail
2
Release tab
4
Pins extended through the mounting
flange and slide rail