Cisco NAC3350-PROF-K9 Hardware Installation Guide - Page 65
Position Cage Nuts or Clip Nuts, Step 4
View all Cisco NAC3350-PROF-K9 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 65 highlights
Chapter 2 Preparing for Installation Rack-Mounting Your Cisco NAC Appliance CAM/CAS Figure 2-10 Position Cage Nuts or Clip Nuts Front Rear Upper U (For 2 U system) Lower U Optional screw to secure system into the rack Clip or cage nuts 253137 Step 4 Use a screwdriver to install the cage nuts or clip nuts on the inside of the mounting rail, as required for your particular rack, into the selected holes (see Figure 2-11). Figure 2-11 Install Cage Nuts or Clip Nuts Front Rear Front Rear 253138 Cage nuts Clip nuts Step 5 Step 6 Step 7 Use the tab on the rear of the slide rails to align the rear of the slide rail to the rear of the four-post rack. Select the best range among Posts A, B, C, and D to fit into the slots. Adjust the length of the slide rails by moving around the depth adjustment screws and nuts (see Figure 2-12). Once you have the combination and fit you want for your NAC-3355/3395, reinstall and tighten the screws and nuts for both slide rails. OL-20326-01 Cisco NAC Appliance Hardware Installation Guide 2-23