Epson 890N Service Manual - Page 82
CR Motor Removal 2, Bi-d Adjustment
UPC - 010343850019
View all Epson 890N manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 82 highlights
EPSON FX-890/2190 4. Remove the 2 SHAFT,MOUNT,CR (M3x12) screws securing the CR Motor assembly to the FRAME,SUB,RIGHT, and remove the CR Motor. (See Figure 4-18) 5. Remove the 2 CB (M3x6) screws securing the CR Motor to the MOUNTING PLATE,MOTOR,CR, and remove the CR Motor. A D JU S TM E N T R E Q U IR E D After installing the CR Motor, make the following adjustment: • Bi-d Adjustment (p.101) After installing the TIMING BELT,CR, make the following adjustment: • Bi-d Adjustment (p.101) Position the CR Motor assembly on the MOUNTING PLATE,MOTOR,CR correctly as shown below; Revision B CR Motor SHAFT,MOUNT,CR Screws (3x10) x2 Tightening Torque: 0.9±0.1N.m MOUNTING PLATE,MOTOR, CR CB Screws (3x6) x2 Tightening Torque: 0.9±0.1N.m MOUNTING PLATE, MOTOR,CR Cable CR Motor Lead the FFC and lead wires as shown below: Disassembly and Assembly Figure 4-18. CR Motor Removal 2 Printer Mechanism Disassembly 82